Press Release Details

Clenergy Presents to Indonesian Solar Industry Players
HELD at Hotel Mulia Senayan in Jakarta, the PV Technical Roadshow was a joint training event with Jinko Solar, Goodwe and UOB. The event brought solar industry players from across Indonesia together, including installers, distributors, retailers, developers, Engineering, Procurement and Construction (EPC) players, rooftop owners and designers.
Over a hundred industry participants attended the event, which gave them a ringside view of the solar industry solutions and service offerings presented by the co-hosts. Samir Jacob, Clenergy Global Marketing Manager, presented PV-ezRack with a deep dive into SolarRoof, SolarTerrace, ezTrackerTM, Clenergy Hollywood, ezShade, PostMount, and the RUNNUR cable management solutions.
“The Indonesian Ministry of Energy and Mineral Resources forecasts that Indonesia has the potential for 400,000 Megawatts (MW) of solar power. Only a total of 154 MW of solar panels have been installed in Indonesia. This is far below Australia (25,000 MW) and Vietnam (16,500 MW), and is even below Singapore (377 MW),” Mr Jacob pointed out.
“According to the Indonesia Solar Energy Association (ISEA), installed capacity for rooftop solar panels could top 1,000 MW next year and rise by between 3,000 MW and 5,000 MW per year starting in 2025,” Mr Jacob added.
“We are honoured to have JJ-LAPP as our Master Distributor here in the ASEAN region. We want to thank our partners and customers for joining us on our exploration of the current and future trends in the renewables industry. We will continue to be a technology enabler for governments, the public sector & enterprises seeking carbon neutrality.”
The video of “PV Technical Roadshow Jakarta” is available below.
![]() |
PT. JJ-LAPP CABLE INDONESIA +62 21 2753 7051 [email protected] | https://www.jj-lapp.com Graha Inti Fauzi, 7th Floor, JI. Buncit Raya, No 22 12510 Jakarta |